Cherry
lodge LANDFILL Action Group
Plans and proposals
This aerial view shows the golf club, within
the red outline, in relation to the surrounding area. The A233, Main
Road, can be seen in the bottom left of the picture. Strawberry
Field is the yellow field in-between. |
This plan shows the new layouts for the
public rights of ways. The red line shows the route of the proposed
haul road leading from Main Road to the golf course. The green
dotted line is a bridleway which is crossed by the haul road at
point 6. The yellow dotted line show the new route, of the first
section, of the existing footpath. There will be a new entrance onto
Main Road at point 1 (only 80cm wide!), and it will skirt the small
section of Strawberry field. The purple dotted line is a
byway/bridleway that crosses the field diagonally. It is proposed
that this path will be diverted to a point on Main Road at point 3. |
This plan shows the haul road (in red) where
it meets with Main Road and the wheel washing facility. |
This one shows the southern edge of the
course, the existing bridleway (in light blue) and the haul road
running parallel to it. Note also the blue area at top right. This
is going to be where the haul road enters the golf course and
crosses the bridleway. |
This final plan shows how they propose to
construct the entrance to the site where the haul road meets Main
Road. The darker lines on the two smaller plans show the routes
taken by the lorries as they enter and exit the haul road. It also
shows how much of the hedgerow either side of the entrance they
intend to remove. |
Have your say. Click on the image to sign our guestbook.